Onoteruzaki Shrine
| Design period | August 2006-January 2006 |
| Construction period | March 2007-July 2008 |
| Area | 477.52㎡ |
| Architect | Integrated Design Associates |
| Structural engineer | Toru Yamazaki & engineer |
| Mechanical engineer | Hatano & engineer |
PHOTO CREDIT: I.D.A.