Yunoyama S-Atelier

<<BACK NEXT>>
Design period March 2007-March 2008
Construction period April 2008-November 2009
Area 170.59m2
Architect Integrated Design Associates
Structural engineer Ihara Structural Design Lab.
Mechanical engineer Sou Kankyo Engineers

PHOTO CREDIT: I.D.A.

Close