Yunoyama S-Atelier
| Design period | March 2007-March 2008 |
| Construction period | April 2008-November 2009 |
| Area | 170.59m2 |
| Architect | Integrated Design Associates |
| Structural engineer | Ihara Structural Design Lab. |
| Mechanical engineer | Sou Kankyo Engineers |
PHOTO CREDIT: I.D.A.